RTL Design & Synthesis

RTL Design & Synthesis

Synthesisable, lint-clean, constraint-aware RTL — and the netlist that comes out of it.

What we deliver

We take a specification, a micro-architecture note, or an existing RTL base, and deliver synthesisable RTL together with the constraints and the synthesis netlist that downstream teams can actually implement. RTL that simulates but does not synthesise cleanly is not a deliverable.

Scope of work

Front-end design

Micro-architecture definition and trade-off analysis, block partitioning, interface and protocol definition, pipeline and throughput planning, FSM and datapath design.

RTL implementation

SystemVerilog / Verilog / VHDL coding to your style guide, parameterised and reusable modules, clock and reset architecture, standard bus interface integration.

RTL quality

Lint clean-up to a defined ruleset, clock-domain-crossing and reset-domain-crossing analysis, structural checks, and code/coverage readiness before handoff to verification.

Synthesis

Constraint development

SDC authoring and review — clock definitions, generated clocks, I/O timing, false and multicycle paths, with a documented rationale for every exception.

Synthesis & QoR

Constraint-driven synthesis with area, timing and power trade-off runs, DFT-aware and physical-aware synthesis where the flow supports it, and QoR trend reporting per run.

Low power & signoff

UPF/CPF-based power intent, clock gating and multi-Vt strategy, and formal equivalence checking between RTL and netlist at every handoff.

Typical deliverables

  • Synthesisable RTL source with a documented file/module hierarchy
  • Design specification or micro-architecture document
  • Lint and CDC reports, clean to an agreed waiver list
  • SDC constraint set with exception rationale
  • Synthesis scripts, gate-level netlist and QoR reports (timing, area, power)
  • Formal equivalence (RTL ↔ netlist) signoff report
  • Release notes and a reproducible run script

Need RTL delivered against a schedule?

Send us the specification and the target library, and we will come back with scope, assumptions and a timeline.